Agent Office
LEARN / TECHNICAL PROGRAM MANAGER

TPM best practices

The best technical program managers decide how much time a piece of work is worth before anyone plans it, and they give each goal one owner and a test that it passes or fails. They look for the risky dependencies before the work starts and run each launch from a checklist, and their status report names what is still unknown next to what is done. An AI Technical Program Manager keeps your tracker, your launch plan and the weekly status report current for you, and a person on your team owns the scope and every date that other teams depend on.

Updated by Pavel Hegler

You setThe time and the scope

What each piece of work is worth

Every dayEach milestone in the tracker

With its owner and its date

Every weekOne status report

What is done next to what is still unknown

The process

The steps below follow one program from the first idea to the launch. They come from three chapters of Shape Up by Ryan Singer, a post by Bill Carr and a page on the PR/FAQ process, both on Working Backwards, the site of the book by Colin Bryar and Bill Carr, and the chapter on launches in the Google SRE book.

Ryan Singer, Basecamp

1. Fix the time first

In the chapter Set Boundaries of Shape Up, Singer writes that at Basecamp they usually set an appetite for each project, a time budget, in two sizes: a small batch that one designer and one or two programmers can build in one or two weeks, and a big batch that takes the same team a full six weeks. An appetite, he writes, is completely different from an estimate, and when they hand the work to a team, the fixed time box pushes it to decide what is core to the project and what is peripheral or unnecessary. We take from this that each milestone in your plan has its time budget written next to it, and a piece of work that grows past its budget comes back to you before the plan changes.

“Appetites start with a number and end with a design.”
Shape Up, chapter 3: Set Boundaries
Bill Carr, Working Backwards

2. Give each goal one owner

In a post on the Working Backwards site, Carr writes that Amazon uses a simple, flat list of goals with no hierarchy, written so precisely that at the end of the timeframe a goal is either met or not met. For S-team goals, which the post marks as the level of the senior executives and the c-suite, owners report status monthly or quarterly in red, yellow and green, where yellow signals risk and red indicates that the goal will not be met unless you make a significant change. We take from this that each milestone has one named owner and a test that it passes or fails, and the weekly report marks each one green, yellow or red.

“Each goal has a single owner and objective pass/fail criteria.”
How Amazon sets clear, actionable goals with no hierarchy, 2026
Working Backwards, the book’s site

3. Ask the hard questions in writing

The page on the PR/FAQ process on the site of the book Working Backwards, by Colin Bryar and Bill Carr, says that most of the major products and initiatives of Amazon since 2004 were created through Working Backwards, which starts by defining the customer experience, and that its principal tool is a press release with a list of frequently asked questions. A well-written internal FAQ, the page says, anticipates the questions from every department and should cover all the challenging problems that need to be solved to build the product, and one of its sample questions asks about third-party business relationships or dependencies. We take from this that each program starts with a short written brief, and the hard questions and the dependencies on other teams are on it before the first milestone gets a date.

“It should be optimistic but also realistic.”
The Amazon Working Backwards PR/FAQ Process
Ryan Singer, Basecamp

4. Look for the rabbit holes

In the chapter Risks and Rabbit Holes, Singer writes that all it takes is one hole in the concept to derail a project, and that a team that runs into an unanticipated problem that takes two weeks to solve has burned a third of its six-week budget. Technical unknowns, unsolved design problems or misunderstood interdependencies, he writes, could make the project take multiple times the original appetite, and one way to find them is to walk through a use case in slow motion. We take from this that the risks of each milestone get written down early, each one next to the team it depends on, and an open risk comes to you with the tickets and a proposal.

Shape Up, chapter 5: Risks and Rabbit Holes
Google SRE

5. Run the launch from a checklist

The chapter on reliable product launches in the Google SRE book, written by Rhandeev Singh and Sebastian Kirsch with Vivek Rau, describes the Launch Coordination Engineering team of Google, whose tasks include acting as a liaison between the teams of a launch, making sure that tasks maintain momentum and acting as gatekeepers who sign off on launches determined to be “safe”. Its launch checklist gives the launching team action items and pointers to more information, and the chapter says that the checklist needs continuous attention to stay relevant. We take from this that each launch has a checklist with an owner for each item, and the go for the launch stays a decision of your team.

“Checklists are used to reduce failure and ensure consistency and completeness”
Reliable Product Launches at Scale
Ryan Singer, Basecamp

6. Report what is unknown

In the chapter Show Progress, Singer writes that to-do lists grow as the team makes progress. Basecamp shows the status of each scope on a hill: uphill while the team figures out its approach, downhill once it can see all the work. He writes that nobody wants to raise their hand and tell management that they do not know how to solve a problem, which causes teams to hide uncertainty and accumulate risk, and that effective teams take the most important problems with the most unknowns uphill first. We take from this that the weekly status report names what is still unknown next to what is done, and a piece of work that stays uphill week after week gets a line of its own for you.

Shape Up, chapter 13: Show Progress

Source: Ryan Singer, Shape Up, Basecamp, current text · Bill Carr, How Amazon sets clear, actionable goals with no hierarchy, 2 January 2026 · Rhandeev Singh and Sebastian Kirsch with Vivek Rau, Reliable Product Launches at Scale, in Site Reliability Engineering, Google, © 2017 on the page

What it takes

Your AI Technical Program Manager reads every update in your tracker each morning with its own login and writes to the owner of each blocked task until the right people are on it, so the status is current with no babysitting on your side. A date that other teams depend on moves after you agree.

TodayStatus comes from asking around
  • A status meeting to learn where things stand
  • Blocked tasks found at the next sync
  • A launch plan that runs behind the tracker
  • Risks that come up in the week of the launch
With your AI Technical Program ManagerStatus is in the tracker each morning
  • Each milestone checked against the tracker every day
  • A message to the owner of each blocked task
  • The launch plan updated when a date slips, and each team told
  • A risk with the tickets and a proposal, while you can still act

Milestones checked daily

Each milestone of the program gets compared with the tracker every day, and a date at risk gets a flag with the tickets behind it.

Blockers followed up

A blocked task gets a message to its owner, and your AI Technical Program Manager follows up until the right people are on it.

Syncs with notes

Each sync has an agenda before it, and the decisions and their owners go out after it.

One weekly report

Your leads get one report each week with what moved, what is still unknown, what is at risk and what needs a decision from you.

What you keep

  • The scope and the dates

    You decide what goes into each milestone and when it is due, and a date that other teams depend on moves only after your YES. How to manage an AI employee.

  • Who works on what

    Your leads decide who works on each task, and your AI Technical Program Manager writes to the owner that they named.

  • The launch and the promises

    A person on your team signs off each launch and each release, and what you promise to customers and leadership stays with your team.

  • Bulk changes and paid tools

    Closing or deleting tickets in bulk waits for your YES, and so does a paid tool for the team.

How you check

Singer writes in the chapter Show Progress that the hill chart becomes the first place a manager goes when they feel anxious about a project, and since it is self-serve, there is no need to interrupt the team with the awkward status question. We take from this that you read the weekly report before you ask anyone for status, and you then ask about the one piece of work that looks stuck.

Every weekWhat you read
  • The status report, with what is still unknown first
  • Each milestone that turned yellow or red, with its owner
  • The blockers and how long each one stayed open
Once a monthWhat you compare
  • The dates in the report against the dates you promised
  • A few milestones in the tracker against what the report says
  • The checklist of the next launch against its owners

Carr writes that at the end of the timeframe of a goal there is no partial credit and no scoring system, just pass or fail. We take from this that a milestone counts as done in the report when its test passes, and the report names each one that missed.

Source: Ryan Singer, Shape Up, chapter 13: Show Progress, current text · Bill Carr, How Amazon sets clear, actionable goals with no hierarchy, 2 January 2026

The first week

Your AI Technical Program Manager spends its first days with what your teams already wrote down, and before Friday you get one page with every milestone, its owner and its risk, ready for your corrections.

  1. When you hire itThe briefIts job and goals, changed until they fit, then your yes
  2. Its first morningAccessIts own login to the tracker, the docs and the team chat
  3. The next three daysThe program on one pageMilestones, owners and risks for you to correct
  4. Its first FridayThe first status reportWith the agenda of each sync next week
OWNER · HEGLER TECHNOLOGIES

Written by Pavel Hegler

Mission: "Employ AI employees alongside humans without technical burdens."

Updated

About Hegler Technologies

Want to stay updated?

Leave your email and Elena writes to you herself. She is one of our AI employees, so you see how one works before you hire your own. Privacy.